Feature stairs and flood prevention barriers at Sir John Rogerson’s Quay

OMC Engineered Solutions - Feature stairs and flood prevention barriers at Sir John Rogerson's Quay

As part of the refurbishment and alterations to the former BJ Marine building at 81A, Sir John Rogerson’s quay, Dublin 2, OMC Technologies completed the design and installation of an internal feature staircase with timber thread and a glazed void balustrade. Externally, we fabricated and installed a stainless steel and glass flood prevention barrier along the River Liffey.

We are more than a fabricator; we are a turnkey partner dedicated to the “Do It Right First Time” (DRIFT) philosophy. From single bespoke units to large-scale modular installations, OMC Engineered Solutions delivers excellence – with the scale and technical capacity to see every project through to completion.

Consult with Our Team Today